CURRENT WORKS

No.PROJECT TITLEBIDANG KERJA
1.THE PROPOSED PERMANENT REMEDIAL WORKS FOR DEFECTIVE SOIL SLOPE AT KM424.80 SOUTHBOUND ,SECTION C3, SUNGAI BULOH-TANJUNG MALIM EXPRESSWAY.

PLB/AMMD/C3/HR/MLINE/2016-0001
 Soil Treatment
 Soil Nailing
 Horizontal Drain
 Guniting
2.THE SUPPLY DELIVERY OF RAW MATERIALS AND RELATED ITEMS FOR WATER PIPE FABRICATION AND MANUFACTURING. Water pipe
3.EAST KLANG VALLEY EXPRESSWAY (EKVE) PROJECT.

PACKAGE 2 (MAINLINE CH 14764 – CH 23090, INTERCHANGES & SPUR ROADS) – SLOPE STABILIZATION WORKS (SOIL NAILING).
 Rock Bolt
 Rock Netting
 Soil Nailing
4.CADANGAN HERITAGE TRAIL 5 MENGHUBUNGKAN: PARCEL ‘A’ PRECINT 7 R.O.L. KE DATARAN MERDEKA KE BANGUNAN WARISAN (RUMAH DBKL, GALERI KUALA LUMPUR DAN WISMA EKRAN) JALAN TANGSI KE JALAN PARLIMEN (2013/G029) Caisson Pile